CONCRETE COATINGS

By

Desert Rose

 

 

telephone:

     623-853-9051

      License #203136

Garages...Driveways...Patios...Walkways... 

If You Have Concrete... We Can Make It Beautiful!!

 Home
About
Flagstone
Sim Cool Deck
Borders
Tuscany
Chips
Lt.Sprinkle Chips
Garages
Designs
Random Slate


Garages

 

 

                         PROCEDURE FOR EPOXY POLYURETHANE

DAY ONE

1. Rocks and grass are edged away from concrete so that we can coat low on all sides of concrete.

2. Any and all oil stains are treated with zylene; this chemical absorbs oil and grease.

3. All concrete is etched with muratic acid; this removes dirt and grime

4. All concrete is treated with ammonia; this neutralizes any acid left behind.

5. Any cracks or chips in the concrete are filled but not guaranteed.

6. Apply one coat of Epoxy Primer to concrete surface; this is left to dry overnight.

DAY TWO

1. Apply any 24 colors of polyurethane 100 UV.

2. Aggregate is added for no slipping.

3. Surface can be washed on (light traffic) twenty-four hours after completion.

4. Vehicles (including golf carts) can e driven on surface five days after completion.

 

 

For General Information & Sales, Contact:  623-853-9051
     email us: dsrtrose@thedesertrose.com
 Always the Right Choice  

 webmaster: faux@bellavilladesign.com  Last modified: 11/15/07